CLOSE
CPS ES-125kW/261kWh-EU
  • All-in-one design with higher energy density 
  • Intelligent cell monitoring with multi-level electrical protection 
  • Minimized workload on site thanks to factory acceptance testing 
  • Fire-fighting design at the package level 
  • Multiple electrical interlocking measures and fast failure protection 
  • Long battery cycle life and high system efficiency 
  • 400 VAC output voltage for fast integration into the industrial grid
  • Multi-layer safety protection with upward relief design for a high safety level
  • Supports multi-unit parallel connection to adapt to various application scenarios with strong scalability
  • Factory pre-installation and testing streamline field maintenance, reducing on-site workload
DOWNLOAD CENTER
Datasheet